Eastern Maine Medical Center Combined Heat and Power System |
|
|
|
|
|
|
|
|
|
| Eastern Maine Medical Center Daily Power Generation Summary |
| Formula |
[1] |
[2] |
[3] |
[4] |
([3]*3.413)÷ ([4]*1000) |
[6] |
[7] |
[3]÷ [7] |
| Date |
Percent Valid Data (%) |
Turbine Peak Output (kW) |
Turbine Power Generated (kWh) |
Turbine Fuel Input (MMBtu) |
Electrical Efficiency (% LHV) |
Peak Utility Import (kW) |
Total Utility Import (kWh) |
Percentage of Electricity Generated (%) |
| Feb 08, 2010 |
95.8 |
3,608.5 |
66,892 |
788.2 |
29.0 |
49.6 |
581 |
99.1 |
| Note: Average Lower Heating Value (LHV) of 894 Btu/cubic foot of Natural Gas calculated from Solar Turbine controller |
|
|
|
|
|
| Eastern Maine Medical Center Daily Heat Recovery Summary |
| Formula |
[1] |
[2] |
[3] |
[4] |
([1]*3.413+[3]+[4]) ÷([2]*1000) |
[6] |
| Date |
Total Electricity Generated (kWh) |
Turbine Fuel Input (MMBtu) |
HRSG Heat Recovery (MMBtu) |
Economizer Heat Recovery (MMBtu) |
Total CHP Efficiency (% LHV) |
Chilled Water Load (MMBtu) |
| Feb 08, 2010 |
66,892 |
788.2 |
389.5 |
29.3 |
82.1 |
0.0 |
| Note: Average Lower Heating Value (LHV) of 894 Btu/cubic foot of Natural Gas calculated from Solar Turbine controller |
|
|
|
|
|
|